- Overview
- FAQ
Basic Info.
Model NO.
Pro50
Condition
New
Certification
ISO9001
Standard
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Customized
Customized
Material
Stainless Steel
Application
Metal Processing Machinery Parts
OEM/ODM
Accecpted
Drawing Format
Standard Style or Dwg, Iges, Pdf
Delivery Time
5-45 Days Depends on Quantities
Equipment
CNC Turning&Milling, 3/4/5 Axis Center Machining
Micro Machining or Not
Micro Machining
Tolerance
±0.005mm
Quality Inspection or Not
Yes
Size
Customized
Transport Package
Wooden Box
Specification
Stainless Steel
Trademark
BestPro or Customized
Origin
Ningbo
HS Code
847490000
Production Capacity
Over 100, 000 Pieces/Year
Product Description




| 1. Which payment methods are accepted? |
| At BestPro, we accept payment methods such as T/T bank transfer and Paypal. |
| 2. What file formats do you work with? |
| The file formats we can accept include dwg, iges, stp, and pdf. |
| 3. Only have a sample, no drawings. Can you complete the task? |
| Certainly. Our design engineers can draft technical drawings from your sample and manufacture the product accordingly. |
| 4. How do you ensure good quality? |
| At BestPro, quality is our top priority. We implement robust systems, including pre-article inspections, in-process checks, and final inspections. With advanced equipment like CMM for precision measurement, we ensure exceptional quality control, earning the trust of our customers. |
| 5. Do you have a minimum order quantity? |
| NO!-No minimum quantity! BestPro provides prototypes and short tomedium-run production machining services. |
| 6. What precision tolerances can BestPro achieve? |
| Precision Machining Tolerances down to +/- 0005mm. BestPro can manufactureand inspect tight tolerances per your drawing specifcations. |
| 7. What general tolerances can BestPro achieve? |
| General Machining Tolerances on metal to +/- 0.005mm unless otherwisespecifed. Plastics and composites will be +/- 0.0254mm. |
| 8. How quickly can l get my parts? |
| Lead times are 2 to 3 weeks for prototypes and 4 weeks for production runs. Emergency and rush services are available. |